IVAN BRICE ARCHITECTURE
  • INTRO
  • PROJECTS
    • Repurposing & Retrofit >
      • Mundelein Hall
      • Americas Society
      • Bethell Senior Ctr
      • St. John Cathedral
      • Syers Penthouse
      • Firehouse Gallery
    • Strategic Planning & Design >
      • Stone Court
      • Cabrini Terrace
      • Riverbay Lobbies
      • Belmondo Montauk
    • Facade Restoration & Reconstruction >
      • Americas Society
      • Evergreen Apts
      • Roger Morris Apts
      • 171 West 12th Street
      • 135 Wooster St
      • Public Health Lab
      • 124 West 72nd St
      • 49 East 68th St
      • Mundelein Hall
    • Roofing/Waterproofing Assemblies >
      • Landmark School
      • City of Norwalk
      • 330 Riverside Dr
      • PS 279
      • PS 206
      • PS 21
    • Window Replacement >
      • Americas Society
      • Co-op City
      • 250 Cabrini Blvd
      • 37-06 82nd St
      • Castle Village
  • EXPERTISE
  • TEAM
  • CLIENTS
  • NEWS
  • RESOURCES
  • CONTACT

PS 21  School Construction Authority   Williamsbridge  Bronx​
Work on the Philip H. Sheridan School in the Bronx was part of a term-contract for the NYC School Construction Authority. This project involved all phases of design and construction for exterior envelope, including full roof replacement, parapet rebuilding, ornamental stonework replacement, and rebuilding of areaways’ rubble stone walls with new railings.  

​
This was one of six schools assigned to our firm under a 5-year term contract with the School Construction Authority. Our office completed all phases of design and construction-related services on these projects; the budgets for each school ranged from $1.2 to $6.2 million dollars for construction costs. Our responsibilities began with detailed surveys and scope reports to establish the budget and scope of each project. We then took each project through to construction documents, bidding, construction administration and close-out. Our exterior envelope work addressed brick and stone masonry repointing and replacement, parapet and bulkhead rebuilding, and roofing  replacement. We also renewed outdoor sports and play areas.  

Interior renovation work included general redesign/reconfiguration of interior spaces as well as structural repairs, plaster/paint refinishing of walls, upgrading restrooms to ADA compliance, creating early childhood restrooms, replacing auditorium ceiling and lighting, rebuilding a stage, retrofitting of existing systems, piping and drainage replacement, and grout injection waterproofing to eliminate flooding.
​

  • INTRO
  • PROJECTS
    • Repurposing & Retrofit >
      • Mundelein Hall
      • Americas Society
      • Bethell Senior Ctr
      • St. John Cathedral
      • Syers Penthouse
      • Firehouse Gallery
    • Strategic Planning & Design >
      • Stone Court
      • Cabrini Terrace
      • Riverbay Lobbies
      • Belmondo Montauk
    • Facade Restoration & Reconstruction >
      • Americas Society
      • Evergreen Apts
      • Roger Morris Apts
      • 171 West 12th Street
      • 135 Wooster St
      • Public Health Lab
      • 124 West 72nd St
      • 49 East 68th St
      • Mundelein Hall
    • Roofing/Waterproofing Assemblies >
      • Landmark School
      • City of Norwalk
      • 330 Riverside Dr
      • PS 279
      • PS 206
      • PS 21
    • Window Replacement >
      • Americas Society
      • Co-op City
      • 250 Cabrini Blvd
      • 37-06 82nd St
      • Castle Village
  • EXPERTISE
  • TEAM
  • CLIENTS
  • NEWS
  • RESOURCES
  • CONTACT